Lightning To USB Type C Cable

Rated 5 out of 5

USB Type C To Lightning Cable

  1. 27W 9V 3A
  2. Support customized
  3. Brand logo
train

Fast Delivery within 30 days

flash-drive

Sample Policy

repairing-service

Light Customized

warranty (1)

12 Month Warranty

Description

Lightning To USB Type C Cable

Product Specifications:

  • Connectors: Lightning (output to device) to USB Type-C (input to power source).
  • Color: Black .
  • Construction: In-mold molding process for enhanced durability; outer shell is permanently integrated, preventing detachment.
  • Function: Supports Power Delivery (PD) fast charging for compatible Apple devices and high-speed data transfer.
  • Material: Durable braided cable for tangle resistance and longevity.

Usage Scenarios:

  • Rapid Charging: Quickly power up iPhones, iPads, and AirPods that support PD fast charging.
  • Data Transfer: Sync photos, videos, and files between Apple devices and USB-C enabled computers.
  • Reliable Connectivity: Ideal for daily use, travel, and demanding environments where cable durability is crucial.

How to Use:

  1. Connect the USB Type-C end to a USB-C Power Delivery (PD) wall charger, power bank, or computer’s USB-C port.
  2. Connect the Lightning end to your iPhone, iPad, or other Apple Lightning device.
  3. Ensure both charger and device support PD for optimal fast charging.

Compatible Devices:

  • iPhones: iPhone 8 and newer models (e.g., iPhone X, 11, 12, 13, 14, 15 series, SE 2nd/3rd Gen) for fast charging. All Lightning iPhones for standard charging.
  • iPads: iPad (5th Gen and later), iPad Air (3rd Gen and later), iPad mini (5th Gen and later), iPad Pro (models with Lightning port) for fast charging (specific models) or standard charging.
  • Other Apple Devices: AirPods, Magic Keyboard, Magic Mouse (compatible models with Lightning port).

 

Additional information

Color

Black

Length

100cm

MOQ

2000 pcs

Function

Power Charging & Data Transfer

Sample

Support

Frequently Asked Questions

The following are some common basic questions. If you have any additional questions, please contact us.

General

Our company Located in Dongguan City, Near Shenzhen and HongKong, Around 32km to Yantian Port. 

Product provide 12 month guarantee, if there is any problem pls contact with us, we will provide extra quantities since next order for compensation.

Depend on the quantities, design and season, For common order, 3K bulk order around 25-32 days for first time.  

Very welcome all customer from overseas visit our factory, we will show you around and contact details face to face. 

For new customer, we are happy to start small test order with you, it could workable way for both of us to know each other and move forward to standard order. 

Quote

Thanks to contact with us to get a quote, there is serval information we need to inspection.  

  1. What design you prefer ? 
  2. Length 
  3. Color 
  4. What problem do you want to handle ? 

After deep contact with you, we will make a quote and share with you within 24hours working time. 

Of course, we would be happy to provide you with samples for testing. Please contact us to confirm the specific sample details.

This is a false premise, because we can never guarantee that our prices are the lowest on the market at all times. After all, there are always better options available.

Our quotations are generally valid for 30 days. This is because raw material prices are constantly changing, and 30 days is the most practical period for ensuring the accuracy of our quotes.

Shipping

We ship from Dongguan City, Guangdong Province, which is located between Guangzhou and Shenzhen, and adjacent to Hong Kong.

Hello, we will suggest delivery options based on the volume of your goods. If the goods are high-value but small in size, they can usually be delivered to your door via international logistics and express services such as DHL, FedEx, and UPS.

Sea freight is usually the cheapest shipping method, but it takes a long time. You can arrange your orders in advance according to your own procurement plan, so as not to delay the product launch and miss the best time to sell.

For air freight, we will provide a tracking number after the goods are dispatched, which you can track yourself. We will also track the shipment daily and update you until you receive the goods.

For sea freight, we will track the shipment weekly and remind you one week before arrival at the port. Please prepare all necessary documents so that you can promptly collect your goods after customs clearance.

It depends on what stage the goods have reached in the journey; usually, once the goods have been shipped, changes cannot be made.

Production

After the raw materials arrive at the factory, we will conduct the first round of material quality inspection, and then production will begin. For example, the production time for an order of 3,000 products is about one week.

Currently, our factory operates on a custom order basis, and all materials are purchased only after the order is confirmed. Therefore, if an order has already started production, we cannot accept canceling the order and unilaterally bearing the losses.

To prevent some air-freighted goods from being crushed or rained on during transportation, protective foam will be placed inside the cardboard box, and a woven bag will be added to the outside of the cardboard box and wrapped with tape to effectively prevent damage to the products inside.

Work With Best Partner

Get A Best Offer

We will reply you question after we get your message within 2 Hours.

Write your details